← Valley Drilling Co — Home(909) 795-6164

Building an ADU
on a Septic Property?

Your county wants proof the septic can handle it — before the building permit. We evaluate, test, engineer, and upgrade. One contractor, since 1950.

California made ADUs legal almost everywhere — but if your property runs on septic, the county will not issue a building permit until you prove the septic system can handle the extra bedrooms. That proof step is where ADU projects stall, and it is exactly the work we have done since 1950.

Here is the core rule: septic capacity in California is sized by total bedroom count on the parcel, not by the number of buildings. A 3-bedroom house with a 2-bedroom ADU is treated as a 5-bedroom load. If your existing tank and leach system were sized for 3 bedrooms, the county will require an upgrade before the ADU is approved.

How the ADU Septic Process Works

  1. System evaluation. We locate and assess your existing tank and leach system and pull whatever records the county has.
  2. Capacity determination. Total future bedrooms vs. rated capacity. Sometimes the existing system passes as-is — that is the cheapest possible outcome, and we will tell you honestly if you have it.
  3. Soil testing if needed. Expanding leach capacity usually requires current PERC or soil-profile data. We test to your county’s protocol.
  4. Engineered design. Our in-house engineers design the upgrade — upsized tank, expanded leach lines, seepage pit, or ATU where soil demands it — as permit-ready plans.
  5. Permits and construction. We submit to the county, build with our own equipment, and meet the inspector.

County by County

San Bernardino County reviews ADU septic through Environmental Health Services and generally follows bedroom-based sizing with required setbacks from the new structure. Riverside County DEH runs one of the stricter programs and commonly requires soil data for any dispersal expansion. Los Angeles County layers regional water-board rules on top for many parcels. Orange County ADUs on septic — mostly canyon and estate properties — go through county health review. We work in all four and keep current on each one’s quirks.

The Mistake That Costs ADU Builders the Most

Designing the ADU first and checking septic last. If the septic evaluation happens after architectural plans are drawn, a required leach field expansion can collide with where the ADU was placed — setback rules mean the dispersal area and the structure fight for the same ground. Bring us in before the site plan is final and we will tell you where the septic needs to live, so you only draw the plans once.

Get an ADU Septic Evaluation →

Related: PERC & soil testing · Inspections & certifications · Septic FAQ